<?xml version="1.0" encoding="UTF-8"?><ns2:project xmlns:ns1="http://gtr.rcuk.ac.uk/gtr/api" xmlns:ns2="http://gtr.rcuk.ac.uk/gtr/api/project" xmlns:ns3="http://gtr.rcuk.ac.uk/gtr/api/fund" xmlns:ns4="http://gtr.rcuk.ac.uk/gtr/api/person" xmlns:ns5="http://gtr.rcuk.ac.uk/gtr/api/project/outcome" xmlns:ns6="http://gtr.rcuk.ac.uk/gtr/api/organisation" ns1:created="2026-06-22T07:57:45Z" ns1:href="http://gtr.ukri.org/gtr/api/projects/5FE55101-F138-4086-8ABE-D4E82FB53839" ns1:id="5FE55101-F138-4086-8ABE-D4E82FB53839"><ns1:links><ns1:link ns1:href="http://gtr.ukri.org/gtr/api/persons/55DD0641-7480-4791-BAFD-6F5B43083DA3" ns1:rel="PM_PER"/><ns1:link ns1:href="http://gtr.ukri.org/gtr/api/organisations/E8B44EAD-DDFA-4598-95F8-4601BADA5B56" ns1:rel="LEAD_ORG"/><ns1:link ns1:href="http://gtr.ukri.org/gtr/api/organisations/6F6EB7C0-32F5-424D-8C63-2A47A147D08D" ns1:rel="PARTICIPANT_ORG"/><ns1:link ns1:href="http://gtr.ukri.org/gtr/api/organisations/3A294354-4906-4BCC-8A1C-547F719E115B" ns1:rel="PARTICIPANT_ORG"/><ns1:link ns1:href="http://gtr.ukri.org/gtr/api/organisations/BC4D0218-3234-4BC7-8B8D-728F4FB5F883" ns1:rel="PARTICIPANT_ORG"/><ns1:link ns1:href="http://gtr.ukri.org/gtr/api/organisations/6A4ADA37-8380-44B2-A1B6-9346C8522788" ns1:rel="PARTICIPANT_ORG"/><ns1:link ns1:href="http://gtr.ukri.org/gtr/api/organisations/E8B44EAD-DDFA-4598-95F8-4601BADA5B56" ns1:rel="PARTICIPANT_ORG"/><ns1:link ns1:href="http://gtr.ukri.org/gtr/api/organisations/9E908391-DBF7-4A5F-838B-7592C1BD823C" ns1:rel="PARTICIPANT_ORG"/><ns1:link ns1:href="http://gtr.ukri.org/gtr/api/organisations/EA2F841A-D6B7-4BC7-B8AD-72AB174309BE" ns1:rel="PARTICIPANT_ORG"/><ns1:link ns1:end="2030-06-29T23:00:00Z" ns1:href="http://gtr.ukri.org/gtr/api/funds/659FA420-C3BC-41AE-8C86-710D55D0350A" ns1:rel="FUND" ns1:start="2023-09-30T23:00:00Z"/></ns1:links><ns2:identifiers><ns2:identifier ns2:type="RCUK">10070138</ns2:identifier></ns2:identifiers><ns2:title>eSOV: Electric SOV with Methanol Range Extender</ns2:title><ns2:status>Active</ns2:status><ns2:grantCategory>Collaborative R&amp;D</ns2:grantCategory><ns2:leadFunder>Innovate UK</ns2:leadFunder><ns2:abstractText>The market for OSW (Off-Shore Wind) support vessels is growing rapidly, with between 62-149 vessels required in UK Waters by 2030. However, even best-in-class vessels currently use fossil fuel and might do so throughout their entire life costing over &amp;pound;17.5m in damage to the environment. All the UK-operating SOV have been built abroad.
Bibby Marine (BML), alongside partners Kongsberg, Shell, DNV, Liverpool JohnMoores University (LJMU), the Port of Aberdeen (PoA) and ORE Catapult, is leading a project to build the first electric SOV (eSOV). This 90m electric vessel, would operate completely emission-free in-field and would feature a sizable battery unlike any installed on a DP vessel before, with dual-fuel methanol-powered engines as back-ups.
SOV's service the wind farm industry, supporting the maintenance operations of offshore wind farms (OWF). Battery power is the natural solution for an SOV operating in an OWF - , essentially a giant power plant. The ship will be ready for offshore charging, which will give it the ability to operate fully electric, before recharging at night, therefore completing up to a full two-week cycle of in-field operations, emissions-free. For long transits, the engines will be in use and will still have a 90% reduction in emissions compared to a conventional vessel, saving the taxpayer approximately &amp;pound;787,500py in damage to the environment compared to a conventional SOV. The near shore operations of this vessel will be completed under battery-power only, which also reduces the impact of emissions on public health.
This project uses developing technology in order operate emission-free, but we are using equipment that has already been proven in action, integrating them all together and at a scale never reached before. If offshore charging is not available,the vessel will be able to use its methanol engines to recharge the batteries,reducing emissions by 50% compared to a conventional SOV. We believe the project will also break the stalemate between the vessel and infrastructure technology, kicking off the demand for zero-emission vessels.
We have a strong consortium of high-quality industry stakeholders, and we are committed to promote and re-develop British shipbuilding. We will be working alongside British shipyards and the NSO to maximise the benefits such a landmark ship will have on the industry. This project will position the UK as a pioneer in the sector and showcase UK leadership in the design and integration of battery-powered vessels.</ns2:abstractText></ns2:project>