<?xml version="1.0" encoding="UTF-8"?><ns2:project xmlns:ns1="http://gtr.rcuk.ac.uk/gtr/api" xmlns:ns2="http://gtr.rcuk.ac.uk/gtr/api/project" xmlns:ns3="http://gtr.rcuk.ac.uk/gtr/api/fund" xmlns:ns4="http://gtr.rcuk.ac.uk/gtr/api/person" xmlns:ns5="http://gtr.rcuk.ac.uk/gtr/api/project/outcome" xmlns:ns6="http://gtr.rcuk.ac.uk/gtr/api/organisation" ns1:created="2026-06-03T15:52:43Z" ns1:href="http://gtr.ukri.org/gtr/api/projects/693F5C07-D797-4865-ABFD-A6A59B447F6B" ns1:id="693F5C07-D797-4865-ABFD-A6A59B447F6B"><ns1:links><ns1:link ns1:href="http://gtr.ukri.org/gtr/api/persons/01661A16-FF0D-44DA-8EAB-513F6AD33259" ns1:rel="PM_PER"/><ns1:link ns1:href="http://gtr.ukri.org/gtr/api/organisations/D107ACB8-3866-4E43-93A0-BCCED2382E86" ns1:rel="LEAD_ORG"/><ns1:link ns1:href="http://gtr.ukri.org/gtr/api/organisations/D107ACB8-3866-4E43-93A0-BCCED2382E86" ns1:rel="PARTICIPANT_ORG"/><ns1:link ns1:end="2015-07-30T23:00:00Z" ns1:href="http://gtr.ukri.org/gtr/api/funds/2770FF83-F6E9-4690-8725-6641B88D31A6" ns1:rel="FUND" ns1:start="2013-11-01T00:00:00Z"/></ns1:links><ns2:identifiers><ns2:identifier ns2:type="RCUK">720379</ns2:identifier></ns2:identifiers><ns2:title>m-Riser</ns2:title><ns2:status>Closed</ns2:status><ns2:grantCategory>GRD Development of Prototype</ns2:grantCategory><ns2:leadFunder>Innovate UK</ns2:leadFunder><ns2:abstractText>The UK’s world class Oil &amp;amp; Gas industry, comprising both production and essential support
services, is a vital part of the UK economy and the Government’s future industrial strategy.
Magma Global Ltd (Magma) epitomises this technology lead with its unique m-pipe
development from which it is now expanding its product portfolio. The proposed ‘m-Riser’
Project is one such development. The key aims and objectives are to:
1) Develop a subsea ‘production riser’ (i.e. sectional pipe to link a sea bed oil well to a surface
collection vessel);
2) Design and implement a rigorous test regime and test equipment to prove operational
capability (e.g. pressure, bending, torsion) and compliance with UK and industry standards
3) Initiate field trials with a leading UK FTSE 250 independent oilfield operator on a marginal
(i.e. previously uneconomic) North Sea oil well using an early production vessel.
The innovation and novel aspects will include:
1) The first production riser manufactured from Magma’s unique and innovative
PEEK/Carbon m-pipe;
2) Engineering unique jointing methodology between the m-pipe and industry standard
coupling components;
3) Developing a unique testing regime to substantiate a riser solution with significant
performance benefits over steel and other current alternatives.
The main benefits will include:
1) The ability to economically extract further oil reserves from marginal (previously
uneconomic) North Sea wells and provide a valuable early production and reservoir data
gathering facility from newly drilled wells world-wide;
2) The ability of an early production vessel to stay on station through adverse Met-Ocean
conditions. A typical early production vessel will only achieve 85-90 % utilisation. Magma is
targeting 95% giving an additional 20-40 production days pa, increasing output values &amp;pound;30-
&amp;pound;60m.
Magma will introduce unique innovation into the subsea Oil &amp;amp; Gas industry which will
deliver significant economic and operational benefits to UK producers</ns2:abstractText></ns2:project>