<?xml version="1.0" encoding="UTF-8"?><ns2:project xmlns:ns1="http://gtr.rcuk.ac.uk/gtr/api" xmlns:ns2="http://gtr.rcuk.ac.uk/gtr/api/project" xmlns:ns3="http://gtr.rcuk.ac.uk/gtr/api/fund" xmlns:ns4="http://gtr.rcuk.ac.uk/gtr/api/person" xmlns:ns5="http://gtr.rcuk.ac.uk/gtr/api/project/outcome" xmlns:ns6="http://gtr.rcuk.ac.uk/gtr/api/organisation" ns1:created="2026-07-08T08:44:08Z" ns1:href="http://gtr.ukri.org/gtr/api/projects/915EFCA7-CAB4-4070-A67A-FA31A5267233" ns1:id="915EFCA7-CAB4-4070-A67A-FA31A5267233"><ns1:links><ns1:link ns1:href="http://gtr.ukri.org/gtr/api/persons/0B498E95-F065-4102-A945-CD6EF63346BF" ns1:rel="PM_PER"/><ns1:link ns1:href="http://gtr.ukri.org/gtr/api/organisations/1ADF5804-3687-4315-A9F9-2839CFCD5251" ns1:rel="LEAD_ORG"/><ns1:link ns1:href="http://gtr.ukri.org/gtr/api/organisations/1ADF5804-3687-4315-A9F9-2839CFCD5251" ns1:rel="PARTICIPANT_ORG"/><ns1:link ns1:end="2026-03-30T23:00:00Z" ns1:href="http://gtr.ukri.org/gtr/api/funds/776DD060-6AD1-4F17-8E42-3D631B943A7B" ns1:rel="FUND" ns1:start="2024-09-30T23:00:00Z"/></ns1:links><ns2:identifiers><ns2:identifier ns2:type="RCUK">10124598</ns2:identifier></ns2:identifiers><ns2:title>JCR: Retrofit application of spectrally selective coatings for transmission line jumper conductors</ns2:title><ns2:status>Closed</ns2:status><ns2:grantCategory>Collaborative R&amp;D</ns2:grantCategory><ns2:leadFunder>Innovate UK</ns2:leadFunder><ns2:abstractText>The current carrying capacity of overhead transmission, and distribution (T+D) lines has become a key constraint for global electrification. Global electricity demand is due to increase 75-150% 2022-2050 (IEA,2022). The current mechanisms to increase T+D capacity are based on large infrastructure projects such as reconductoring, taking 3-7 years, costing &amp;pound;300k/km or building new lines (7-10 years, &amp;pound;1mn+/km).

More cost-effective ways to increase transmission and distribution capacity are required. This project involves the development of an automated coating systems for overhead lines, configured to deploy a specialised photonic coating which increases the capacity of overhead lines. This will permit a transition from a T+D uprating paradigm of heavy infrastructure projects to one of advanced mechatronics and functional coatings.</ns2:abstractText></ns2:project>