<?xml version="1.0" encoding="UTF-8"?><ns2:project xmlns:ns1="http://gtr.rcuk.ac.uk/gtr/api" xmlns:ns2="http://gtr.rcuk.ac.uk/gtr/api/project" xmlns:ns3="http://gtr.rcuk.ac.uk/gtr/api/fund" xmlns:ns4="http://gtr.rcuk.ac.uk/gtr/api/person" xmlns:ns5="http://gtr.rcuk.ac.uk/gtr/api/project/outcome" xmlns:ns6="http://gtr.rcuk.ac.uk/gtr/api/organisation" ns1:created="2026-06-03T15:52:43Z" ns1:href="http://gtr.ukri.org/gtr/api/projects/D5FF16AB-1951-4D73-8E6F-35BEAC73F8D8" ns1:id="D5FF16AB-1951-4D73-8E6F-35BEAC73F8D8"><ns1:links><ns1:link ns1:href="http://gtr.ukri.org/gtr/api/persons/B9886546-0ADA-418D-AE31-0C6DCF8906D9" ns1:rel="PM_PER"/><ns1:link ns1:href="http://gtr.ukri.org/gtr/api/organisations/7A1A6BA8-2355-438B-AC2B-3CBAFC4D4683" ns1:rel="LEAD_ORG"/><ns1:link ns1:href="http://gtr.ukri.org/gtr/api/organisations/7A1A6BA8-2355-438B-AC2B-3CBAFC4D4683" ns1:rel="PARTICIPANT_ORG"/><ns1:link ns1:end="2026-09-29T23:00:00Z" ns1:href="http://gtr.ukri.org/gtr/api/funds/447A0175-0E66-4EB7-B0E4-F6234488CD32" ns1:rel="FUND" ns1:start="2022-09-30T23:00:00Z"/></ns1:links><ns2:identifiers><ns2:identifier ns2:type="RCUK">10037822</ns2:identifier></ns2:identifiers><ns2:title>Towards tURbine Blade production with zero waste (TURBO)</ns2:title><ns2:status>Active</ns2:status><ns2:grantCategory>EU-Funded</ns2:grantCategory><ns2:leadFunder>Horizon Europe Guarantee</ns2:leadFunder><ns2:abstractText>&amp;gt;10000 wind turbine blades (WTBs) were installed in Europe in 2019, and the largest are &amp;gt;100 m long. Yet the manufacturing methods have not changed significantly since the 1970s, with little or no NDT or in-line control, leading to high defect, repair and scrap rates. TURB0 will reduce defects and improve repair strategies in WTB composites and coatings. -Improved composite production processes: By using the latest simulation techniques to avoid defect formation and understand how defects affect structural integrity. -In-line NDT: Combining three cutting-edge NDT technologies (dielectric, wireless, sensor-less) for the first large scale in-line in situ composite production monitoring. -Sub-surface WTB coating inspection: Currently coatings only undergo visual surface inspection or destructive testing. TURB0 will combine ultrasound and mid-IR OCT for the most detailed coating assessment ever performed. -Digital twin and data warehouse: Production equipment, monitoring and in-line NDT data will be combined to establish a digital twin for real-time analysis of production. This has never been attempted for a large-scale composite part. It will populate a data warehouse accessible from multiple production sites. -In-line system control: Using the digital twin, a ML-based algorithm will provide closed-loop process control to minimise defect formation and waste and optimise process efficiency. -Automated repair strategy: The digital twin enables a ML analysis of defect severity in composites, with automated strategies to reduce repairs by 90 % and increase recycling of off-cuts. -Full-scale demo: A demo on a full size &amp;gt;80 m WTB section will be performed at the SGRE factory in Aalborg. -Quantified sustainability improvements: including life cycle analysis (LCA), social LCA and circular economy assessments to quantify environmental and socioeconomic benefits. -Dissemination and exploitation activity: includes a powerful Advisory Board, training, standards and business plan.no public description</ns2:abstractText></ns2:project>