Real-Time Optimization-Based Reference Calculation Integrated Control for MMCs Considering Converter Limitations (2022)
Attributed to:
Resilient Electricity Networks for a productive Grid Architecture (RENGA)
funded by
GCRF
Abstract
No abstract provided
Bibliographic Information
Digital Object Identifier: http://dx.doi.org/10.1109/tpwrd.2021.3119148
Publication URI: http://dx.doi.org/10.1109/tpwrd.2021.3119148
Type: Journal Article/Review
Parent Publication: IEEE Transactions on Power Delivery
Issue: 4