KES - Kite Energy Scheme
Lead Participant:
KITE POWER SYSTEMS LIMITED
Abstract
Kite Power Solutions Ltd (KPS) is the UK's only developer of a technology to generate electricity from the wind
using kites. KPS was formed in 2011 to develop this innovative disruptive wind energy technology. KPS predicts
a market entry in 2025 for a 3MW floating offshore system which has a cost of electricty 50% of conventional
wind turbines, lower than the wholesale price of electricity removing the requirement for subsidies.
This project enables KPS to further scale the existing demonstrated technology with leading UK businesses.
These collaborators are BVG Associates supporting the optimisation of the power conversion system; Artemis
Intelligent Power providing support in the drive train development; Imperial College supporting aerodynamic
development of the wings; The National Composites Centre optimising kite material and manufacturing
processes; Keynvor Morlift Ltd to conduct mooring and installation assessments; Banks Sails as KPS kite
manufacturing partner. The project will also involve engagement with the wider public and the environmental
stakeholders to assess the impacts of the rollout of KPS kite energy technology.
using kites. KPS was formed in 2011 to develop this innovative disruptive wind energy technology. KPS predicts
a market entry in 2025 for a 3MW floating offshore system which has a cost of electricty 50% of conventional
wind turbines, lower than the wholesale price of electricity removing the requirement for subsidies.
This project enables KPS to further scale the existing demonstrated technology with leading UK businesses.
These collaborators are BVG Associates supporting the optimisation of the power conversion system; Artemis
Intelligent Power providing support in the drive train development; Imperial College supporting aerodynamic
development of the wings; The National Composites Centre optimising kite material and manufacturing
processes; Keynvor Morlift Ltd to conduct mooring and installation assessments; Banks Sails as KPS kite
manufacturing partner. The project will also involve engagement with the wider public and the environmental
stakeholders to assess the impacts of the rollout of KPS kite energy technology.
Lead Participant | Project Cost | Grant Offer |
---|---|---|
KITE POWER SYSTEMS LIMITED | £738,619 | £ 517,033 |
  | ||
Participant |
||
BRUCE BANKS SAILS LIMITED | £57,062 | £ 39,943 |
IMPERIAL COLLEGE OF SCIENCE, TECHNOLOGY AND MEDICINE | £98,856 | |
ARTEMIS INTELLIGENT POWER LIMITED | £107,115 | £ 53,515 |
NCC OPERATIONS LIMITED | £64,958 | £ 64,958 |
INNOVATE UK | ||
KEYNVOR MORLIFT LIMITED | £60,780 | £ 42,546 |
BVG ASSOCIATES LIMITED | £74,441 | £ 52,109 |
KITE POWER SOLUTIONS LIMITED | £258,152 | £ 180,706 |