CAVE (Construction Accredited Volumetric Exchange) is a framework for bringing together all the required parties to deliver accredited volumetric construction: the clients, the designers, the certifiers, the materials suppliers, the assemblers and log

Lead Participant: SKANSKA TECHNOLOGY LIMITED

Abstract

CAVE (Construction Accredited Volumetric Exchange) is a framework for bringing together all the required

parties to deliver accredited volumetric construction: the clients, the designers, the certifiers, the materials

suppliers, the assemblers and logistics. CAVE will reduce risk throughout the supply chain, encouraging

suppliers to invest in the manufacturing capabilities needed to enable the delivery of quality volumetric

solutions to meet contractors, and end users needs. The whole system will be accredited and enable efficient

exchange (selection) of the suitable organisations for a given project.

The feasibility study will review, develop and assess the CAVE framework concept in the context of other supply

chain focussed initiatives such as the drive towards industrialised construction and automation. It will use the

information collected to assess its suitability for mainstream use in Skanska (and wider) supply chains. It will

establish the next steps towards implementation (including investment, R&D, cultural change and skills needs).

Lead Participant

Project Cost

Grant Offer

SKANSKA TECHNOLOGY LIMITED £50,108 £ 25,054
 

Participant

INNOVATE UK
BUILDING RESEARCH ESTABLISHMENT LIMITED £39,864 £ 19,932
ROLLALONG LIMITED £35,163 £ 17,582
PANEL2PANEL LIMITED £20,298 £ 14,209

People

ORCID iD

Publications

10 25 50