DUNE: Pre-Construction Phase

Lead Research Organisation: University of Birmingham
Department Name: School of Physics and Astronomy

Abstract

Abstracts are not currently available in GtR for all funded research. This is normally because the abstract was not required at the time of proposal submission, but may be because it included sensitive information such as personal details.

Planned Impact

See central Je-S form submitted by the University of Cambridge

Publications

10 25 50
 
Description Successfully demonstrated that the proposed approach to triggering and data acquisition worked in the DUNE prototype experiment (ProtoDUNE-SP).
Results used in the choice of baseline technology for the DUNE experiment construction.
Monitoring system developed for ProtoDUNE and contributed to success of the prototype operation.
They are being extended now for use in the final DUNE data acquisition system and its demonstration in the next ProtoDUNE run.
Exploitation Route May inform the design of future experiments
Sectors Other