Rehabilitation of Overdeformed Metro Tunnel in Shanghai by Multiple Repair Measures (2019)

First Author: Zhang D
Attributed to:  CSIC Innovation and Knowledge Centre Phase 2 funded by EPSRC

Abstract

No abstract provided

Bibliographic Information

Digital Object Identifier: http://dx.doi.org/10.1061/(asce)gt.1943-5606.0002169

Publication URI: http://dx.doi.org/10.1061/(asce)gt.1943-5606.0002169

Type: Journal Article/Review

Parent Publication: Journal of Geotechnical and Geoenvironmental Engineering

Issue: 11