Increasing nodal capacity by redesigning the train timetable: A case study on the UK?s railway (2012)
Attributed to:
Overcoming Capacity Constraints - A Simulation Integrated with Optimisation for Nodes (OCCASION)
funded by
EPSRC
Abstract
No abstract provided
Bibliographic Information
Type: Conference/Paper/Proceeding/Abstract
Parent Publication: VeRoLog Conference