GridPP networking infrastructure (DRI) - Bristol Grant
Lead Research Organisation:
University of Bristol
Department Name: Physics
Abstract
Equipment only, agreed in relation to the network infrastructure for robust and resilient computing and storage services for the LHC Grant (DRI -bid).
Planned Impact
Equipment only, agreed in relation to the network infrastructure for robust and resilient computing and storage services for the LHC Grant (DRI -bid).
Organisations
People |
ORCID iD |
| David Newbold (Principal Investigator) |
Publications
Aaij R
(2012)
Observation of B0?D¯(0)K(+)K(-) and evidence for B(s)(0)?D¯(0)K(+)K(-).
in Physical review letters
Aaij R
(2012)
Measurement of the cross-section ratio s ( ? c 2 ) / s ( ? c 1 ) for prompt ? c production at s = 7 TeV
in Physics Letters B
Aaij R
(2012)
Publisher's Note: Evidence for C P Violation in Time-Integrated D 0 ? h - h + decay rates [Phys. Rev. Lett. 108 , 111602 (2012)]
in Physical Review Letters
Aaij R
(2012)
Measurement of the CP violating phase ? s in B ¯ s 0 ? J / ? f 0 ( 980 )
in Physics Letters B
Aaij R
(2012)
First observation of the decays B ¯ ( s ) 0 ? D s + K - p + p - and B ¯ s 0 ? D s 1 ( 2536 ) + p -
in Physical Review D
CMS Collaboration
(2012)
A new boson with a mass of 125 GeV observed with the CMS experiment at the Large Hadron Collider.
in Science (New York, N.Y.)
Aaij R
(2012)
Observation of B(s)(0) ? J/?f(2)'(1525) in J/?K+ K- final states.
in Physical review letters
Chatrchyan S
(2012)
Search for new physics in the multijet and missing transverse momentum final state in proton-proton collisions at vs = 7 TeV.
in Physical review letters
Aaij R
(2012)
A model-independent Dalitz plot analysis of B ± ? D K ± with D ? K S 0 h + h - ( h = p , K ) decays and constraints on the CKM angle ?
in Physics Letters B
Collaboration T
(2012)
Performance of CMS muon reconstruction in pp collision events at vs = 7 TeV
in Journal of Instrumentation