📣 Help Shape the Future of UKRI's Gateway to Research (GtR)

We're improving UKRI's Gateway to Research and are seeking your input! If you would be interested in being interviewed about the improvements we're making and to have your say about how we can make GtR more user-friendly, impactful, and effective for the Research and Innovation community, please email gateway@ukri.org.

Tier 2 Hardware Funding

Lead Research Organisation: Imperial College London
Department Name: Physics

Abstract

This grant is for equipment only, and has been agreed related to the previously issued grant ST/F006748/1.

Publications

10 25 50

publication icon
Collaboration C (2010) Performance of CMS muon reconstruction in cosmic-ray events in Journal of Instrumentation

publication icon
Collaboration C (2010) Precise mapping of the magnetic field in the CMS barrel yoke using cosmic rays in Journal of Instrumentation

publication icon
Collaboration C (2010) Time reconstruction and performance of the CMS electromagnetic calorimeter in Journal of Instrumentation

publication icon
Collaboration C (2010) Commissioning and performance of the CMS pixel tracker with cosmic ray muons in Journal of Instrumentation

publication icon
Khachatryan V (2010) CMS tracking performance results from early LHC operation in The European Physical Journal C

publication icon
Collaboration C (2010) Performance of the CMS cathode strip chambers with cosmic rays in Journal of Instrumentation

publication icon
Collaboration C (2010) Commissioning of the CMS experiment and the cosmic run at four tesla in Journal of Instrumentation

publication icon
Collaboration C (2010) Alignment of the CMS silicon tracker during commissioning with cosmic rays in Journal of Instrumentation

publication icon
Collaboration C (2010) CMS data processing workflows during an extended cosmic ray run in Journal of Instrumentation

publication icon
Collaboration C (2010) Performance study of the CMS barrel resistive plate chambers with cosmic rays in Journal of Instrumentation

publication icon
Collaboration C (2010) Performance of the CMS drift tube chambers with cosmic rays in Journal of Instrumentation

publication icon
Collaboration C (2010) Commissioning of the CMS High-Level Trigger with cosmic rays in Journal of Instrumentation

publication icon
Collaboration C (2010) Alignment of the CMS muon system with cosmic-ray and beam-halo muons in Journal of Instrumentation

publication icon
Collaboration C (2010) Performance of the CMS hadron calorimeter with cosmic ray muons and LHC beam data in Journal of Instrumentation

publication icon
Collaboration C (2010) Measurement of the muon stopping power in lead tungstate in Journal of Instrumentation

publication icon
Collaboration C (2010) Performance and operation of the CMS electromagnetic calorimeter in Journal of Instrumentation

publication icon
Collaboration C (2010) Performance of the CMS drift-tube chamber local trigger with cosmic rays in Journal of Instrumentation

publication icon
Collaboration C (2010) Fine synchronization of the CMS muon drift-tube local trigger using cosmic rays in Journal of Instrumentation

publication icon
Colling D (2010) Real Time Monitor of Grid job executions in Journal of Physics: Conference Series

publication icon
Khachatryan V (2010) Search for dijet resonances in 7 TeV pp collisions at CMS. in Physical review letters

publication icon
Andreeva J (2010) CMS analysis operations in Journal of Physics: Conference Series

publication icon
Albert M (2010) Experience building and operating the CMS Tier-1 computing centres in Journal of Physics: Conference Series

publication icon
Khachatryan V (2011) Dijet azimuthal decorrelations in pp collisions at vs=7 TeV. in Physical review letters

publication icon
Collaboration T (2011) Determination of jet energy calibration and transverse momentum resolution in CMS in Journal of Instrumentation

publication icon
Buchmueller O (2011) Implications of initial LHC searches for supersymmetry in The European Physical Journal C