📣 Help Shape the Future of UKRI's Gateway to Research (GtR)

We're improving UKRI's Gateway to Research and are seeking your input! If you would be interested in being interviewed about the improvements we're making and to have your say about how we can make GtR more user-friendly, impactful, and effective for the Research and Innovation community, please email gateway@ukri.org.

Towards tURbine Blade production with zero waste (TURBO)

Lead Participant: NCC OPERATIONS LIMITED

Abstract

>10000 wind turbine blades (WTBs) were installed in Europe in 2019, and the largest are >100 m long. Yet the manufacturing methods have not changed significantly since the 1970s, with little or no NDT or in-line control, leading to high defect, repair and scrap rates. TURB0 will reduce defects and improve repair strategies in WTB composites and coatings. -Improved composite production processes: By using the latest simulation techniques to avoid defect formation and understand how defects affect structural integrity. -In-line NDT: Combining three cutting-edge NDT technologies (dielectric, wireless, sensor-less) for the first large scale in-line in situ composite production monitoring. -Sub-surface WTB coating inspection: Currently coatings only undergo visual surface inspection or destructive testing. TURB0 will combine ultrasound and mid-IR OCT for the most detailed coating assessment ever performed. -Digital twin and data warehouse: Production equipment, monitoring and in-line NDT data will be combined to establish a digital twin for real-time analysis of production. This has never been attempted for a large-scale composite part. It will populate a data warehouse accessible from multiple production sites. -In-line system control: Using the digital twin, a ML-based algorithm will provide closed-loop process control to minimise defect formation and waste and optimise process efficiency. -Automated repair strategy: The digital twin enables a ML analysis of defect severity in composites, with automated strategies to reduce repairs by 90 % and increase recycling of off-cuts. -Full-scale demo: A demo on a full size >80 m WTB section will be performed at the SGRE factory in Aalborg. -Quantified sustainability improvements: including life cycle analysis (LCA), social LCA and circular economy assessments to quantify environmental and socioeconomic benefits. -Dissemination and exploitation activity: includes a powerful Advisory Board, training, standards and business plan.no public description

Lead Participant

Project Cost

Grant Offer

NCC OPERATIONS LIMITED £1,192,513 £ 1,192,513

Publications

10 25 50