NanocompEIM Phase II- Nanaocomposite Advanced Electrical Insulation System for Enhanced HVAC and HVDC Energy Networks
Lead Participant:
UK GRID SOLUTIONS LIMITED
Abstract
NanocompEIM Phase 2 will develop pre-commercial nanocomposite material formulations and component
manufacturing processes scaled to full sized components for future power transmision networks including
HVDC and HVAC converter and substation equipment for new smaller and more efficient network installations
to meet the needs of future low carbon smarter energy grids. The project will produce selected full size
components nanocomposite-based prototypes for specific HVDC and also HVAC applications to support the
reliable operation of on and offshore renewable energy power networks. The project includes a dissemination
phase, designed to support whole industry adoption of nanocompEIM materials technology. This is a vertically
integrated project, which engages the complete supply chain from materials producers to equipment
manufacturers to end-users in the form of all three Transmission System Operators in the UK who will
ultimately use the components containing the materials made by the processes that this project will produce.
manufacturing processes scaled to full sized components for future power transmision networks including
HVDC and HVAC converter and substation equipment for new smaller and more efficient network installations
to meet the needs of future low carbon smarter energy grids. The project will produce selected full size
components nanocomposite-based prototypes for specific HVDC and also HVAC applications to support the
reliable operation of on and offshore renewable energy power networks. The project includes a dissemination
phase, designed to support whole industry adoption of nanocompEIM materials technology. This is a vertically
integrated project, which engages the complete supply chain from materials producers to equipment
manufacturers to end-users in the form of all three Transmission System Operators in the UK who will
ultimately use the components containing the materials made by the processes that this project will produce.
Lead Participant | Project Cost | Grant Offer |
---|---|---|
UK GRID SOLUTIONS LIMITED | £409,913 | £ 204,956 |
  | ||
Participant |
||
GNOSYS GLOBAL LTD | £636,097 | £ 445,269 |
EV3 TECHNOLOGIES LTD | ||
UNIVERSITY OF SOUTHAMPTON | £369,810 | |
UK GRID SOLUTIONS LIMITED |
People |
ORCID iD |
Fabrice PERROT (Project Manager) |