CROWN 2 - Cost Reduction for Offshore Wind Now 2

Lead Participant: TWI LIMITED

Abstract

"CROWN 2 builds on a previously-funded project (CROWN) that aims to completely change the way offshore wind foundations are protected from corrosion. While a well-established and robust solution is to use a paint and galvanic anode approach, protection lifetime is limited by paint degradation and anode mass. Such systems are also expensive to manufacture, install and maintain.

The consortium will be investigating whether a single coating of aluminium, applied to the surface by arc-spraying, can replace paint and anodes entirely. If successful, such a coating would lower the cost of wind energy, by removing bottlenecks in the manufacture of wind turbine foundations and eliminating a significant amount of secondary steelwork that has to be expensively welded by skilled professionals."

Lead Participant

Project Cost

Grant Offer

TWI LIMITED £305,592 £ 305,592
 

Participant

EDF ENERGY RENEWABLES LIMITED £65,898 £ 32,949
EAST ANGLIA ONE LIMITED £85,129 £ 42,564
EDF ENERGY R&D UK CENTRE LIMITED £143,016 £ 71,508
INNOVATE UK
OFFSHORE RENEWABLE ENERGY CATAPULT £101,002 £ 101,002
RWE RENEWABLES UK LIMITED £115,998 £ 69,599
METALLISATION LIMITED £77,283 £ 46,370
SCOTTISHPOWER RENEWABLES (UK) LIMITED £11,713 £ 5,856
ARCELORMITTAL LIMITED £20,000
ORSTED WIND POWER A/S £66,897
SAIPEM U.K. LIMITED £104,000
LICENERGY (UK) LIMITED £7,161 £ 5,013