Product Based Building Solutions - High Productivity Digital Integrated Assured DfMA for Lifecycle Performance

Abstract

"**Productivity is a critical factor for the UK economy** -- especially in the construction industry. . As stated in the Farmer Review of the Construction Industry, we need to ""modernise or die"", and this is recognised by the Construction Sector Deal.

While offsite manufacturing techniques improve both quality and productivity, a step change is needed to realise the true potential of Design for Manufacture and Assembly (DfMA). That step change is product-based design solutions and manufacturing capacity that unlocks optimised construction and extends efficiency throughout the delivery cycle. We call this **Product Based Building Solution (PBBS) DfMA 70:60:30** -- with 70% of the building being premanufactured, providing 60% greater productivity and 30% faster construction than traditional approaches.

The potential improvements to productivity are enormous, with only a small team of skilled technicians needed to place and integrate the pre-manufactured and quality controlled building components.

The key to realising this potential lies in having good products and approaching the early design process with product-based solutions in mind, rather than trying to apply them as an after-thought.

As such, Laing O'Rourke, AMRC, Hoare Lea, Autodesk, Project Frog, BRE, ActivePlan, Dynamic Knowledge, Converge, University of Cambridge have aligned to demonstrate this product-based approach to design and construction -- an approach that could radically change the industry. By creating a product-based approach to buildings, we have the potential to transform site construction to a place of assembly of pre-engineered and certified building products. Together, we will:

* Evidence **lower carbon lifecycles, targeting a 30% operational reduction** -- based on integrating heating and cooling systems within the structure -- and a **50% saving in embodied carbon** through a reusable structural system with predicable performance through smart commissioning and better science.
* Demonstrate **productivity improvements in each delivery phase** -- design, manufacture and assembly -- through physically and digitally enabled process efficiency and waste elimination.
* Use a product-based architecture with defined and repeatable interfaces to provide quality and certainty in delivery. This will include **facades, frame, internal walls and finishes, pods, and building services and controls**.

This will enable:

* **Digital demonstration** of configuration to products sets to a range of sector applications using real-world building examples
* **Physical demonstration** of integrated product-based building solutions at full scale for a representative building at Explore Industrial Park
* **Evidence of productivity and performance** assurance metrics and benchmarking to support further scaling up and adoption"

Lead Participant

Project Cost

Grant Offer

LAING O'ROURKE SERVICES LIMITED £1,514,362 £ 757,181
 

Participant

SELECT PLANT HIRE COMPANY LIMITED
BUILDING RESEARCH ESTABLISHMENT LIMITED £187,102 £ 187,102
DEFENCEKNOWLEDGE LIMITED £94,474 £ 66,132
PROJECT FROG £32,617
AUTODESK LIMITED £42,951
HOARE LEA LLP £90,260 £ 45,130
UNIVERSITY OF CAMBRIDGE £235,344 £ 235,344
UNIVERSITY OF CAMBRIDGE
INNOVATE UK
OCTAGON I/O LTD £457,543 £ 320,280
ACTIVEPLAN CONSULTING LIMITED £161,812 £ 113,268
UNIVERSITY OF SHEFFIELD £249,992 £ 249,992