NexGen Battery (NGB)
Lead Participant:
INTEGRALS POWER LIMITED
Abstract
The need for a resilient, agile and reliable energy storage is critical for the growth of the economy and its decarbonisation of infrastructure. Developed and developing countries both have their own challenges to address; while the cost of battery packs are significant for developed countries, reliable energy access is what developing countries require to flourish. Successful deployment of off-grid solutions that don't rely on the national grid(unreliable and limited) is one of the main identified solutions to overcome this problem. Having said that, off-grid solutions are highly dependent on batteries which currently come with severe limitations: they are non-affordable, environmentally unfriendly and unreliable under harsh climatic conditions & hot temperature.
The outcome of this project will a 8KWh,48V battery pack and three 1.8KWh,12V modular, upgradable and portable battery modules/packs which will be tailored to Mozambican market needs and its high renewable energy source(specifically irradiance) opportunities. NexGen aims to improve accessibility in remote locations, reduce CO2 emission by 20%, reduce battery pack costs by 30% and reduce cost of ownership by 20% by taking advantage of its reusable and recyclable battery pack design.
The outcome of this project will a 8KWh,48V battery pack and three 1.8KWh,12V modular, upgradable and portable battery modules/packs which will be tailored to Mozambican market needs and its high renewable energy source(specifically irradiance) opportunities. NexGen aims to improve accessibility in remote locations, reduce CO2 emission by 20%, reduce battery pack costs by 30% and reduce cost of ownership by 20% by taking advantage of its reusable and recyclable battery pack design.
Lead Participant | Project Cost | Grant Offer |
---|---|---|
INTEGRALS POWER LIMITED | £423,984 | £ 296,789 |
  | ||
Participant |
||
ACELERON LIMITED | £142,845 | £ 99,992 |
ECOSYS ENERGIAS RENOVĂVEIS, LDA | £17,563 | £ 12,294 |
AMTE POWER PLC | £384,223 | £ 268,956 |
CRANFIELD UNIVERSITY | £120,424 | £ 120,424 |
People |
ORCID iD |
Behnam Hormozisheikhtabaghi (Project Manager) |