Nuclear Structure, Astrophysics and Reactions at FAIR

Lead Research Organisation: University of York
Department Name: Physics

Abstract

Abstracts are not currently available in GtR for all funded research. This is normally because the abstract was not required at the time of proposal submission, but may be because it included sensitive information such as personal details.

Publications

10 25 50
publication icon
Akkoyun S (2012) AGATA-Advanced GAmma Tracking Array in Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment

publication icon
Alexander T (2015) Isomeric Ratios in $^{206}$Hg in Acta Physica Polonica B

publication icon
Golubev P (2013) The Lund-York-Cologne Calorimeter (LYCCA): Concept, design and prototype developments for a FAIR-NUSTAR detector system to discriminate relativistic heavy-ion reaction products in Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment

publication icon
Guastalla G (2014) Analysis and results of the 104 Sn Coulomb excitation experiment in Journal of Physics: Conference Series

publication icon
Korten W (2020) Physics opportunities with the Advanced Gamma Tracking Array: AGATA in The European Physical Journal A

publication icon
Lalovic N (2018) Study of isomeric states in 198,200,202,206 Pb and 206 Hg populated in fragmentation reactions in Journal of Physics G: Nuclear and Particle Physics

publication icon
Moschner K (2016) Relativistic Coulomb excitation of Kr 88 in Physical Review C

 
Description We have developed and built, as part of the UK-NUSTAR project, a range of equipment to be used for the NUSTAR project at FAIR, Germany. We have built a time-of-flight detector for identification of exotic nuclei, which has involved investigating different timing solutions, including diamond detectors, but eventually using a large-area plastic scintillator. The plastic scintillator solution has been shown by us to be capable of providing timing measurements with a precision of better than 50ps. We (led by Daresbury, co-ordinated through York) have also developed and built a new ASIC-based electronics system, for the silicon detectors of the LYCCA array at NUSTAR. This uses state of the art digital and analogue electronics to construct a highly versatile and compact/efficient system for signal-processing. We have tested these detectors in-situ at GSI FAIR and are have moved the electronics, and the associated detector, to the University of Koln. At Koln, we will continue testing the new electronics and we plan to use the equipment for fundamental physics research at Koln, up until the move to FAIR when the FAIR facility is ready for operation.
Exploitation Route The technologies we have developed will be used by a wide range of researchers at the Super-FRS facility in the next decade once the FAIR facility is operational. The time-of-flight methodology is of interest to any researcher that needs to making timing measurements for particles at the sub 100ps precision level. The electronics development for the Si detectors is of interest to any industry or research programme that needs to process a large (many thousands) number of detector signals with high efficiency.
Sectors Education,Electronics,Energy

URL http://www.uknustar.org
 
Description AGATA Interim Funding
Amount £491,664 (GBP)
Funding ID ST/T003480/1 
Organisation Science and Technologies Facilities Council (STFC) 
Sector Public
Country United Kingdom
Start 10/2019 
End 03/2021
 
Description AGATA: Precision Spectroscopy of Exotic Nuclei
Amount £756,121 (GBP)
Funding ID ST/T000546/1 
Organisation Science and Technologies Facilities Council (STFC) 
Sector Public
Country United Kingdom
Start 04/2020 
End 03/2024
 
Description LYCCA at Koln 
Organisation University of Cologne
Country Germany 
Sector Academic/University 
PI Contribution We have entered a collaboration with the University of Koln to install, test and utilise the LYCCA calorimeter (built using funding from the current award) at the accelerator facility at the University of Koln Physics department. York provided manpower and co-ordination and funds for building the LYCCA mechanics and testing the equipment. All of the equipment used was funded by the UK NuSTAR grant - through York and Daresbury Laboratory.
Collaborator Contribution Colleagues at the University of Koln have provided manpower, mechanical design effort and, crucially, beam time for testing and utilising the LYCCA array prior to eventual deployment at FAIR.
Impact None yet
Start Year 2014
 
Description UK AGATA Collaboration 
Organisation Daresbury Laboratory
Country United Kingdom 
Sector Private 
PI Contribution Bentley is leading the UK AGATA STFC-funded project. Part of the AGATA project is the preparation of the AGATA phase at FAIR, part of HISPEC. This was one of the three major components of the UK NUSTAR project. Bentley has co-ordinated the collaboration, including the scientific and technical direction of the FAIR part of the AGATA project. The project will contribute to the mechanics, electronics, pulse-shape analysis and simulations for AGATA as part of the NUSTAR project.
Collaborator Contribution Partners are contributing science direction, and technical expertise to the project. The project will contribute to the mechanical design and construction, electronics and data acquisition, pulse-shape analysis and physics simulations for AGATA as part of the NUSTAR project.
Impact Full grant award from STFC 2019-2024
Start Year 2017
 
Description UK AGATA Collaboration 
Organisation University of Liverpool
Country United Kingdom 
Sector Academic/University 
PI Contribution Bentley is leading the UK AGATA STFC-funded project. Part of the AGATA project is the preparation of the AGATA phase at FAIR, part of HISPEC. This was one of the three major components of the UK NUSTAR project. Bentley has co-ordinated the collaboration, including the scientific and technical direction of the FAIR part of the AGATA project. The project will contribute to the mechanics, electronics, pulse-shape analysis and simulations for AGATA as part of the NUSTAR project.
Collaborator Contribution Partners are contributing science direction, and technical expertise to the project. The project will contribute to the mechanical design and construction, electronics and data acquisition, pulse-shape analysis and physics simulations for AGATA as part of the NUSTAR project.
Impact Full grant award from STFC 2019-2024
Start Year 2017
 
Description UK AGATA Collaboration 
Organisation University of the West of Scotland
Country United Kingdom 
Sector Academic/University 
PI Contribution Bentley is leading the UK AGATA STFC-funded project. Part of the AGATA project is the preparation of the AGATA phase at FAIR, part of HISPEC. This was one of the three major components of the UK NUSTAR project. Bentley has co-ordinated the collaboration, including the scientific and technical direction of the FAIR part of the AGATA project. The project will contribute to the mechanics, electronics, pulse-shape analysis and simulations for AGATA as part of the NUSTAR project.
Collaborator Contribution Partners are contributing science direction, and technical expertise to the project. The project will contribute to the mechanical design and construction, electronics and data acquisition, pulse-shape analysis and physics simulations for AGATA as part of the NUSTAR project.
Impact Full grant award from STFC 2019-2024
Start Year 2017
 
Description UK-NUSTAR 
Organisation Daresbury Laboratory
Department Nuclear Physics Support Group
Country United Kingdom 
Sector Academic/University 
PI Contribution We all work towards constructing and exploiting equipment for NUSTAR at the FAIR facility in Darmstadt, Germany. Yorks contribution has been to construct and test the LYCCA device, including time-of-flight detectors, state of the art ASIC-based electronics systems and associated mechanical and electronic engineering.
Collaborator Contribution We all work towards constructing and exploiting equipment for NUSTAR at the FAIR facility in Darmstadt, Germany.
Impact Construction of equipment for NUSTAR
Start Year 2009
 
Description UK-NUSTAR 
Organisation University of Birmingham
Department School of Physics and Astronomy
Country United Kingdom 
Sector Academic/University 
PI Contribution We all work towards constructing and exploiting equipment for NUSTAR at the FAIR facility in Darmstadt, Germany. Yorks contribution has been to construct and test the LYCCA device, including time-of-flight detectors, state of the art ASIC-based electronics systems and associated mechanical and electronic engineering.
Collaborator Contribution We all work towards constructing and exploiting equipment for NUSTAR at the FAIR facility in Darmstadt, Germany.
Impact Construction of equipment for NUSTAR
Start Year 2009
 
Description UK-NUSTAR 
Organisation University of Brighton
Country United Kingdom 
Sector Academic/University 
PI Contribution We all work towards constructing and exploiting equipment for NUSTAR at the FAIR facility in Darmstadt, Germany. Yorks contribution has been to construct and test the LYCCA device, including time-of-flight detectors, state of the art ASIC-based electronics systems and associated mechanical and electronic engineering.
Collaborator Contribution We all work towards constructing and exploiting equipment for NUSTAR at the FAIR facility in Darmstadt, Germany.
Impact Construction of equipment for NUSTAR
Start Year 2009
 
Description UK-NUSTAR 
Organisation University of Edinburgh
Department School of Physics and Astronomy
Country United Kingdom 
Sector Academic/University 
PI Contribution We all work towards constructing and exploiting equipment for NUSTAR at the FAIR facility in Darmstadt, Germany. Yorks contribution has been to construct and test the LYCCA device, including time-of-flight detectors, state of the art ASIC-based electronics systems and associated mechanical and electronic engineering.
Collaborator Contribution We all work towards constructing and exploiting equipment for NUSTAR at the FAIR facility in Darmstadt, Germany.
Impact Construction of equipment for NUSTAR
Start Year 2009
 
Description UK-NUSTAR 
Organisation University of Liverpool
Department Department of Physics
Country United Kingdom 
Sector Academic/University 
PI Contribution We all work towards constructing and exploiting equipment for NUSTAR at the FAIR facility in Darmstadt, Germany. Yorks contribution has been to construct and test the LYCCA device, including time-of-flight detectors, state of the art ASIC-based electronics systems and associated mechanical and electronic engineering.
Collaborator Contribution We all work towards constructing and exploiting equipment for NUSTAR at the FAIR facility in Darmstadt, Germany.
Impact Construction of equipment for NUSTAR
Start Year 2009
 
Description UK-NUSTAR 
Organisation University of Manchester
Country United Kingdom 
Sector Academic/University 
PI Contribution We all work towards constructing and exploiting equipment for NUSTAR at the FAIR facility in Darmstadt, Germany. Yorks contribution has been to construct and test the LYCCA device, including time-of-flight detectors, state of the art ASIC-based electronics systems and associated mechanical and electronic engineering.
Collaborator Contribution We all work towards constructing and exploiting equipment for NUSTAR at the FAIR facility in Darmstadt, Germany.
Impact Construction of equipment for NUSTAR
Start Year 2009
 
Description UK-NUSTAR 
Organisation University of Surrey
Country United Kingdom 
Sector Academic/University 
PI Contribution We all work towards constructing and exploiting equipment for NUSTAR at the FAIR facility in Darmstadt, Germany. Yorks contribution has been to construct and test the LYCCA device, including time-of-flight detectors, state of the art ASIC-based electronics systems and associated mechanical and electronic engineering.
Collaborator Contribution We all work towards constructing and exploiting equipment for NUSTAR at the FAIR facility in Darmstadt, Germany.
Impact Construction of equipment for NUSTAR
Start Year 2009
 
Description UK-NUSTAR 
Organisation University of the West of Scotland
Country United Kingdom 
Sector Academic/University 
PI Contribution We all work towards constructing and exploiting equipment for NUSTAR at the FAIR facility in Darmstadt, Germany. Yorks contribution has been to construct and test the LYCCA device, including time-of-flight detectors, state of the art ASIC-based electronics systems and associated mechanical and electronic engineering.
Collaborator Contribution We all work towards constructing and exploiting equipment for NUSTAR at the FAIR facility in Darmstadt, Germany.
Impact Construction of equipment for NUSTAR
Start Year 2009