Infrared Electric Boiler

Lead Participant: SOLUTIONS BY JIGSAW LIMITED

Abstract

The basic principle is to use heaters with high surface temperatures that are available at low wattage inputs.to provide a high-temperature heat exchange for water.

Lead Participant

Project Cost

Grant Offer

SOLUTIONS BY JIGSAW LIMITED £45,101 £ 45,101
 

Participant

ROUND TOWER CONSULTING LIMITED

Publications

10 25 50