Infrared Electric Boiler
Lead Participant:
SOLUTIONS BY JIGSAW LIMITED
Abstract
The basic principle is to use heaters with high surface temperatures that are available at low wattage inputs.to provide a high-temperature heat exchange for water.
Lead Participant | Project Cost | Grant Offer |
---|---|---|
SOLUTIONS BY JIGSAW LIMITED | £45,101 | £ 45,101 |
  | ||
Participant |
||
ROUND TOWER CONSULTING LIMITED |
People |
ORCID iD |
Matthew Billington (Project Manager) |