Combining Monte-Carlo and Hyper-heuristic methods for the Multi-mode Resource-constrained Multi-project Scheduling Problem (2015)

Abstract

No abstract provided

Bibliographic Information

Digital Object Identifier: http://dx.doi.org/10.48550/arxiv.1511.04387

Publication URI: https://arxiv.org/abs/1511.04387

Type: Preprint