Many-objective process optimisation with constraints for continuous tableting lines : a case study in lovastatin (2022)
Attributed to:
Future Continuous Manufacturing and Advanced Crystallisation Research Hub
funded by
EPSRC
Abstract
No abstract provided
Bibliographic Information
Digital Object Identifier: http://dx.doi.org/10.17868/strath.00081659
Publication URI: https://strathprints.strath.ac.uk/id/eprint/81659
Type: Other