Inspection of RC half-joint bridges in England: Analysis of current practice (2018)
Attributed to:
Reinforced concrete half-joint structures: Structural integrity implications of reinforcement detailing and deterioration
funded by
EPSRC
Abstract
No abstract provided
Bibliographic Information
Digital Object Identifier: http://dx.doi.org/10.17863/cam.27454
Publication URI: https://www.repository.cam.ac.uk/handle/1810/280090
Type: Journal Article/Review