ON-TRACS: Rapid Rail Tension Measurement System.
Lead Participant:
TTI TESTING LIMITED
Abstract
Most modern rail installations use a 'continuously welded rail' which, because of the lack of expansion joints, is laid with a pre- tension as determined by the temperature extremes to be experienced. In order to maintain safe operation during service it is necessary to have a method of measuring residual rail tension (or compression) in situ. Current methods are time consuming and invasive, limiting their application. A prototype will be built which demonstrates a new method to produce a much faster, non invasive and more convenient method.
Lead Participant | Project Cost | Grant Offer |
|---|---|---|
| TTI TESTING LIMITED | £294,771 | £ 206,340 |
|   | ||
Participant |
||
| TRAXION-NDT LTD | £165,989 | £ 116,192 |
People |
ORCID iD |
| Isabel Ridge (Project Manager) |