UP-RATING OF OVERHEAD LINES
Lead Research Organisation:
CARDIFF UNIVERSITY
Department Name: Sch of Engineering
Abstract
The ever increasing demand for electricity consumption accompanied by environmental pressures impose a continuing need for electrical systems modification and growth, partly because of changing operational practices resulting from de-regulation and, partly, due to the increased use of distributed generation, which is changing the demands on transmission and, especially, distribution lines. But for many years now, the opportunities for installation of new lines have become very limited because of public concern over visual and other environmental impacts, and it is clear that extensions to system capacity will have to be met substantially without new lines.The voltage rating and the insulation coordination of transmission and distribution lines is determined by a combined consideration of the voltage stress applied to the line and its electrical strength. The stress arises from overvoltages due to switching transients or lightning surges. The magnitude of the switching overvoltage is controlled by the characteristics of the system components, and is more critical at the highest operating voltages. Lightning overvoltages, on the other hand, are of much larger magnitudes and are more onerous to distribution systems.IEC 60071 makes recommendations for the gaps and clearances to be used for specific voltage levels, and individual operators will then adopt safety factors above and beyond these recommendations, depending upon local conditions. Pollution, for instance, may reduce the breakdown voltage by up to 50%. These adopted clearances are usually very generous and can be optimised using modern equipment and practice.The investigators have researched for many years the possibilities for compact lines and substations through improved co-ordination of insulation and the use of polymeric insulators and more effective protective devices such as ZnO surge arresters. This programme, therefore, proposes to apply the compact line concepts to the up-rating of existing lines. It will involve statistical studies of switching and lightning surges that account for various parameters which affect the overvoltage magnitudes, such as closing times for circuit breakers and analysis of the possible state of the line in order to minimize the risk of re-closing onto trapped charge. The statistical variations of stress and strength of the system will be combined in a voltage-frequency plot to determine the risk of failure, which has to be minimized within economic constraints. The stress will be presented as the probability of a certain overvoltage occurring, and its distribution along a line will be controlled by the judicious placement of modern ZnO surge arresters. Electrical strength, on the other hand, can be presented as a probabilistic breakdown curve. It will be primarily derived from consideration of the breakdown curves taking into account the critical clearances at the tower and along the line. These principles have been studied over the years, but present-day pressures are causing a re-evaluation of the conventional limits and methodology. This is also supported by the excellent performance of modern ZnO surge arresters in controlling overvoltages and the superior pollution performance of new polymeric insulators. The programme will also include laboratory and field experimental programmes to test and characterise the new devices and configurations to be used for the compact design of the uprated lines. The main output of the programme is to establish well researched fundamental principles that will allow an efficient and safe design for the future transmission and distribution lines.The basis of this programme has been proposed by HIVES, Cardiff University and then moderated by discussions with an industry group involving National Grid, four UK DNOs, ESB and three line construction companies, whose views are embedded in the proposed programme.
Publications
A Haddad
(2008)
Performance Of Parallel Surge Arresters
Bhattarai, R.
(2010)
Voltage uprating of overhead transmission lines
Bhattarai, R. ;
(2009)
Application of surge arresters for lightning protection of 33kV wood pole distribution lines
Bhattarai, R.;
(2010)
Voltage uprating of overhead transmission lines
Clark D
(2014)
Controlled Large-Scale Tests of Practical Grounding Electrodes—Part II: Comparison of Analytical and Numerical Predictions With Experimental Results
in IEEE Transactions on Power Delivery
Description | current electrical clearances, as applied on the electrical network are very reliable because they include a suitable margin to ensure voltage withstand. however, these can be reduced significantly if overvoltage protection is used, and hence savings can be achieved. |
Exploitation Route | Future compaction of electrical systems and new designs of air insulated equipment/systems can take advantage of the compaction/uprating concepts established in the projects. such application was already used in compact substation design and the new T-pylon |
Sectors | Energy |
Description | The knowledge and findings of the research project were applied in a research project for National Grid which studied the electrical performance of the new T-Pylon transmission lines. This type of line is now being tested at Eakring training Centre. the new line is expected to be first used in the west country, possibly after 2016. |
First Year Of Impact | 2012 |
Sector | Energy |
Impact Types | Economic |
Description | CF3I gas and mixture as an alternative to SF6 |
Amount | £105,000 (GBP) |
Organisation | Engineering and Physical Sciences Research Council (EPSRC) |
Sector | Public |
Country | United Kingdom |
Start | 09/2010 |
End | 03/2014 |
Description | Centre for integrated renewable energy generation and supply (CIREGS)" |
Amount | £3,600,000 (GBP) |
Organisation | Engineering and Physical Sciences Research Council (EPSRC) |
Sector | Public |
Country | United Kingdom |
Start | 01/2008 |
End | 06/2013 |
Description | Compact substations and conductor systems |
Amount | £210,000 (GBP) |
Organisation | National Grid UK |
Sector | Private |
Country | United Kingdom |
Start | 09/2006 |
End | 10/2009 |
Description | Determination of effects of reactive power compensation on distribution networks: steady state and transient studies |
Amount | £46,000 (GBP) |
Organisation | Western Power Distribution |
Sector | Private |
Country | United Kingdom |
Start | 03/2012 |
End | 07/2013 |
Description | Earthing measurement techniques and apparatus |
Amount | £55,000 (GBP) |
Organisation | Megger Group Limited |
Sector | Private |
Country | United Kingdom |
Start | 03/2007 |
End | 03/2010 |
Description | Electrical Performance of the T-Pylon |
Amount | £138,000 (GBP) |
Organisation | National Grid UK |
Sector | Private |
Country | United Kingdom |
Start | 01/2013 |
End | 12/2013 |
Description | Enhanced ACDC safety volatage limits |
Amount | £216,000 (GBP) |
Organisation | National Grid UK |
Sector | Private |
Country | United Kingdom |
Start | 03/2014 |
End | 06/2016 |
Description | Feasibility of using trifluoromethyl iodide as a replacement for sulphur hexifluoride in high voltage switchgear |
Amount | £25,000 (GBP) |
Organisation | National Grid UK |
Sector | Private |
Country | United Kingdom |
Start | 03/2009 |
End | 06/2009 |
Description | Gas insulated lines for electrical power transport |
Amount | £15,000,000 (GBP) |
Organisation | Government of Wales |
Department | Welsh European Funding Office |
Sector | Public |
Country | United Kingdom |
Start | 05/2016 |
End | 07/2020 |
Description | Impact of offshore networks on the insulation coordination and operation of the NG transmission system |
Amount | £150,000 (GBP) |
Organisation | National Grid UK |
Sector | Private |
Country | United Kingdom |
Start | 06/2009 |
End | 06/2012 |
Description | Innovation in high voltage electrical insulation of electrical energy systems" |
Amount | £17,000 (GBP) |
Organisation | UK-India Education and Research Initiative (UKIERI) |
Sector | Academic/University |
Country | United Kingdom |
Start | 03/2012 |
End | 12/2014 |
Description | Lightning effects on aerospace carbon composite materials, the next generation of materials and components |
Amount | £761,000 (GBP) |
Organisation | Government of Wales |
Department | Welsh European Funding Office |
Sector | Public |
Country | United Kingdom |
Start | 08/2013 |
End | 12/2014 |
Description | Low Carbon Research Institute & CIREGS |
Amount | £610,000 (GBP) |
Organisation | Welsh Assembly |
Sector | Public |
Country | United Kingdom |
Start | 03/2008 |
End | 03/2013 |
Description | Materials and advanced engineering knowledge exchange strategy (MAeKES)" |
Amount | £20,000 (GBP) |
Organisation | Government of Wales |
Department | Welsh European Funding Office |
Sector | Public |
Country | United Kingdom |
Start | 01/2013 |
End | 11/2014 |
Description | Measurement of third party exposure to rise of earth potential (ROEP)" |
Amount | £62,000 (GBP) |
Organisation | Scottish Power Ltd |
Sector | Private |
Country | United Kingdom |
Start | 09/2007 |
End | 08/2009 |
Description | Measurement of third party exposure to rise of earth potential" |
Amount | £100,000 (GBP) |
Organisation | National Grid UK |
Sector | Private |
Country | United Kingdom |
Start | 08/2009 |
End | 09/2010 |
Description | Online detection and location of defective overhead line components using travelling wave transients" |
Amount | £129,000 (GBP) |
Organisation | Knowledge Transfer Partnerships |
Sector | Charity/Non Profit |
Country | United Kingdom |
Start | 03/2009 |
End | 03/2011 |
Description | Optimised location for surge arresters on the transmission network |
Amount | £60,000 (GBP) |
Organisation | National Grid UK |
Sector | Private |
Country | United Kingdom |
Start | 08/2012 |
End | 04/2013 |
Description | The National Grid Transco High Voltage Research Centre |
Amount | £225,000 (GBP) |
Organisation | National Grid UK |
Sector | Private |
Country | United Kingdom |
Start | 01/2011 |
End | 12/2013 |
Description | The National Grid Transco High Voltage Research Centre - Additional funding |
Amount | £103,000 (GBP) |
Organisation | National Grid UK |
Sector | Private |
Country | United Kingdom |
Start | 06/2009 |
End | 12/2010 |
Description | Transformation of the top and tail of energy networks |
Amount | £521,000 (GBP) |
Funding ID | EP/I031707/1 |
Organisation | Engineering and Physical Sciences Research Council (EPSRC) |
Sector | Public |
Country | United Kingdom |
Start | 09/2011 |
End | 09/2015 |
Description | overhead line monitoring system (OHMS) |
Amount | £105,000 (GBP) |
Organisation | Engineering and Physical Sciences Research Council (EPSRC) |
Sector | Public |
Country | United Kingdom |
Start | 09/2008 |
End | 04/2014 |
Description | Babcock International Group Plc |
Organisation | Babcock International Group |
Country | United Kingdom |
Sector | Private |
Start Year | 2007 |
Description | Balfour Beatty Power Networks |
Organisation | Balfour Beatty |
Department | Power Transmission & Distribution |
Country | United Kingdom |
Sector | Private |
Start Year | 2007 |
Description | E.On UK Plc |
Organisation | E ON |
Department | E ON UK |
Country | United Kingdom |
Sector | Private |
Start Year | 2007 |
Description | National Grid |
Organisation | National Grid UK |
Country | United Kingdom |
Sector | Private |
Start Year | 2007 |
Description | SP Power Systems Limited |
Organisation | SP Power Systems Limited |
Country | United Kingdom |
Sector | Private |
Start Year | 2007 |
Description | several magazine, newspapers, radio and TV (CNN, BBC Discovery...)programmes on lightning protection of aircraft |
Form Of Engagement Activity | A press release, press conference or response to a media enquiry/interview |
Part Of Official Scheme? | No |
Geographic Reach | International |
Primary Audience | Media (as a channel to the public) |
Results and Impact | better understanding of lightning impact on aircraft Various organisations and media visit the lab regularly |
Year(s) Of Engagement Activity | 2011,2012,2013,2014 |