Abstract
High-speed rail lines, at ever increasing speeds and distances, are in development both in the UK and world-wide, but up-front capital expenditure can potentially be a major inhibiting factor both to the client and also in the eyes of the public. Cost reductions for these lines could be achievable if the initial costs of the physical construction, the duration of construction and the land take could be reduced. All three of these costs can potentially be reduced for embankments if the industry were to move towards a novel embankment replacement system. In addition embankment replacement systems could significantly improve the performance of the track structure as the dynamic properties of the contained material can be better controlled. However, such technology requires significant performance evaluation and the development of appropriate design guidance before UK industry can justifiably implement it in a project. This project therefore aims to evaluate and produce design guidance for two novel embankment replacement systems as a means to potentially reduce the cost of constructing new high-speed railway lines (particularly in urban environments) and improve the overall track behaviour and hence passenger experience.
Planned Impact
The ability to extend the speed range and/or develop new infrastructure techniques that can potentially reduce the capital expenditure of new lines will have a significant impact on the railway industry both nationally and internationally.
Adopting the GRS-RW and/or PMS-RW systems have the ability to provide that transformational technology for those sections of new lines where embankments are used, to allow significant reductions in the capital expenditure while improving the operational expenditure; studies in Japan show that the track behaviour can be improved when using these structures. It is therefore possible to provide a win-win situation for reducing life cycle costs on new high-speed lines, provided the GRS-RW can be designed for difficult ground conditions (a primary objective of this proposal). This project therefore helps to fulfill the goal of providing new research into the behavior of existing GRS-RW structures and new modular technology termed PMS-RW structures which extend UK technology and expertise in this area.
The project will result in the training of two PDRAs in high-speed railway track design and application which will have a positive effect on increasing the specialist knowledge in the UK for high-speed railways. This research application therefore has an extremely high impact factor and the findings of the project will lead to significant cost savings for new high-speed lines and push UK technology on the international market.
Adopting the GRS-RW and/or PMS-RW systems have the ability to provide that transformational technology for those sections of new lines where embankments are used, to allow significant reductions in the capital expenditure while improving the operational expenditure; studies in Japan show that the track behaviour can be improved when using these structures. It is therefore possible to provide a win-win situation for reducing life cycle costs on new high-speed lines, provided the GRS-RW can be designed for difficult ground conditions (a primary objective of this proposal). This project therefore helps to fulfill the goal of providing new research into the behavior of existing GRS-RW structures and new modular technology termed PMS-RW structures which extend UK technology and expertise in this area.
The project will result in the training of two PDRAs in high-speed railway track design and application which will have a positive effect on increasing the specialist knowledge in the UK for high-speed railways. This research application therefore has an extremely high impact factor and the findings of the project will lead to significant cost savings for new high-speed lines and push UK technology on the international market.
Publications
Dong K
(2018)
The stiffening of soft soils on railway lines
in Transportation Geotechnics
Esen A
(2021)
Full-scale laboratory testing of a geosynthetically reinforced soil railway structure
in Transportation Geotechnics
Marolt CebaĊĦek T
(2018)
Full scale laboratory testing of ballast and concrete slab tracks under phased cyclic loading
in Transportation Geotechnics
Sainz-Aja J
(2020)
Dynamic calibration of slab track models for railway applications using full-scale testing
in Computers & Structures
Yu Z
(2020)
Railway ballast anisotropy testing via true triaxial apparatus
in Transportation Geotechnics
Description | The ability of the GRS system to significantly reduce CO2 emissions during construction has now been confirmed. The technique has the ability to transform the way railway earth structures are constructed. |
Exploitation Route | Once data analysed and published it can be used in design standards. |
Sectors | Transport |
Description | The GRS tests have indicated that these structures can be used for conventional and high-speed railway lines. Follow on studies are now being developed to allow commercial deployment of the technique. This has lead to seminars for industry on their design, application and analysis. It has also lead to further research by colleagues within the EU. |
First Year Of Impact | 2021 |
Sector | Construction,Education,Transport |
Impact Types | Societal |
Description | Institute for High Speed Railways (University of Leeds) |
Organisation | Network Rail Ltd |
Country | United Kingdom |
Sector | Private |
PI Contribution | Setting up a Centre of Excellence for high-speed railways. Techniques developed contribute to design of new high-speed lines such as HS2. This is now called the Institute for High Speed Rail and System Integration |
Collaborator Contribution | Design expertise to build a new research test facility |
Impact | Still being developed. Funding secured to build new testing facilities at the University of Leeds |