T2K Project Manager Funding
Lead Research Organisation:
University of Liverpool
Department Name: Physics
Abstract
PPARC Council, in their last meeting, approved the T2K-UK construction phase. As agreed during PPRP review in 2006, I will take responsibility as project manager for all UK activities, and the project will top up my research time (approved by PPGP at 36%). Hence I am asking here for the 64% to bring this up to 100%.
Organisations
Publications

Abe K
(2012)
First muon-neutrino disappearance study with an off-axis beam
in Physical Review D

Abe K
(2011)
Indication of electron neutrino appearance from an accelerator-produced off-axis muon neutrino beam.
in Physical review letters

Abe K
(2013)
Publisher's Note: T2K neutrino flux prediction [Phys. Rev. D 87 , 012001 (2013)]
in Physical Review D

Abe K
(2015)
Measurements of neutrino oscillation in appearance and disappearance channels by the T2K experiment with 6.6 × 1 0 20 protons on target
in Physical Review D

Abe K
(2013)
T2K neutrino flux prediction
in Physical Review D

Abe K
(2014)
Observation of electron neutrino appearance in a muon neutrino beam.
in Physical review letters

Abe K
(2011)
The T2K experiment
in Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment

Abe K
(2015)
Measurement of the ? µ charged current quasielastic cross section on carbon with the T2K on-axis neutrino beam
in Physical Review D

Abe K
(2012)
Measurements of the T2K neutrino beam properties using the INGRID on-axis near detector
in Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment

Abe K
(2014)
Measurement of the inclusive ? µ charged current cross section on iron and hydrocarbon in the T2K on-axis neutrino beam
in Physical Review D
Description | KM3NeT |
Amount | £118,777 (GBP) |
Funding ID | EU FP6 contract no 011937 |
Organisation | Sixth Framework Programme (FP6) |
Sector | Public |
Country | European Union (EU) |
Start | 02/2006 |
End | 01/2009 |
Description | LAGUNA-LBNO |
Amount | £55,900 (GBP) |
Funding ID | EU FP7 Project Grant Agreement 284518 |
Organisation | European Commission |
Department | Seventh Framework Programme (FP7) |
Sector | Public |
Country | European Union (EU) |
Start | 06/2011 |
End | 06/2014 |
Description | MODES-SNM |
Amount | £185,333 (GBP) |
Funding ID | 284842 FP7-SEC-2011-1 |
Organisation | European Commission |
Department | Seventh Framework Programme (FP7) |
Sector | Public |
Country | European Union (EU) |
Start | 01/2012 |
End | 06/2014 |
Description | Research Grants, Faculty of Science and Engineering |
Amount | £80,000 (GBP) |
Organisation | University of Liverpool |
Sector | Academic/University |
Country | United Kingdom |
Start | 05/2009 |
End | 05/2010 |