Modelling and Dynamic Operation of the Zhoushan DC Grid: Worlds First Five-Terminal VSC-HVDC Project (2015)
Attributed to:
Enhanced Renewable Integration through Flexible Transmission Options (ERIFT)
funded by
EPSRC
Abstract
No abstract provided
Bibliographic Information
Type: Conference/Paper/Proceeding/Abstract