SKA 1 SADT INSTALLATION, COMMISSIONING, OPERATIONAL TESTING AND MONITORING OF SADT LINKS (2016)

First Author: Hughes-Jones R
Attributed to:  SKA Pre-Construction Phase 1 funded by STFC

Abstract

No abstract provided

Bibliographic Information

Type: Technical Report

Volume: Rev 10