Incentive issues in performance-based outsourcing contracts in the UK defence industry: a simulation study (2012)
Attributed to:
EPSRC Centre for Innovative Manufacturing in Through-life Engineering Services
funded by
EPSRC
Abstract
No abstract provided
Bibliographic Information
Digital Object Identifier: http://dx.doi.org/10.1080/09537287.2011.648488
Publication URI: http://dx.doi.org/10.1080/09537287.2011.648488
Type: Journal Article/Review
Parent Publication: Production Planning & Control
Issue: 4-5