Rehabilitation of Overdeformed Metro Tunnel in Shanghai by Multiple Repair Measures (2019)
Attributed to:
CSIC Innovation and Knowledge Centre Phase 2
funded by
EPSRC
Abstract
No abstract provided
Bibliographic Information
Digital Object Identifier: http://dx.doi.org/10.1061/(asce)gt.1943-5606.0002169
Publication URI: http://dx.doi.org/10.1061/(asce)gt.1943-5606.0002169
Type: Journal Article/Review
Parent Publication: Journal of Geotechnical and Geoenvironmental Engineering
Issue: 11