A novel surrogate polytope method for day-ahead virtual power plant scheduling with joint probabilistic constraints (2024)
Attributed to:
Data-driven exploration of the carbon emissions impact of grid energy storage deployment and dispatch
funded by
EPSRC
Abstract
No abstract provided
Bibliographic Information
Digital Object Identifier: http://dx.doi.org/10.1016/j.epsr.2024.110623
Publication URI: http://dx.doi.org/10.1016/j.epsr.2024.110623
Type: Journal Article/Review
Parent Publication: Electric Power Systems Research