Using real-time simulation to assess the impact of a high penetration of LV connected microgeneration on the wider system performance during severe low frequency (2011)
Attributed to:
SUPERGEN 1 Renewal Core - FlexNet: Renewal of the Supergen consortium on Future Network Technologies
funded by
EPSRC
Abstract
No abstract provided
Bibliographic Information
Type: Conference/Paper/Proceeding/Abstract