H1PERBAT - High Performance Battery Pilot Facility
Lead Participant:
WAE TECHNOLOGIES LIMITED
Abstract
Led by Williams Advanced Engineering, a consortium including Aston Martin Lagonda, Unipart Powertrain
Applications, Warwick Manufacturing Group, National Composites Centre, Coventry University, Aspire
Engineering and Productiv, will address the need for high performance electric vehicle (EV) batteries by: 1)
realising a novel flexible battery technology with unrivalled module/system performance; and 2) establishing
a UK pilot facility for high performance batteries.
The H1PERBAT project takes an integrated full life cycle approach to remove constraints on capacity, energy
density and thermal management of EV batteries at module and system level to realise a step change in
performance for demanding EV applications. The test/optimisation of durability, integrity and safety of
technology at cell, module and system level for validated vehicle integration is targeted. The novel pilot
facility will realise unique UK capability in module/system-level R&D and scalability to medium production
volumes to flexibly target UK/global EV OEMs.
Applications, Warwick Manufacturing Group, National Composites Centre, Coventry University, Aspire
Engineering and Productiv, will address the need for high performance electric vehicle (EV) batteries by: 1)
realising a novel flexible battery technology with unrivalled module/system performance; and 2) establishing
a UK pilot facility for high performance batteries.
The H1PERBAT project takes an integrated full life cycle approach to remove constraints on capacity, energy
density and thermal management of EV batteries at module and system level to realise a step change in
performance for demanding EV applications. The test/optimisation of durability, integrity and safety of
technology at cell, module and system level for validated vehicle integration is targeted. The novel pilot
facility will realise unique UK capability in module/system-level R&D and scalability to medium production
volumes to flexibly target UK/global EV OEMs.
Lead Participant | Project Cost | Grant Offer |
---|---|---|
WAE TECHNOLOGIES LIMITED | £8,777,038 | £ 3,753,939 |
  | ||
Participant |
||
PRODUCTIV LIMITED | £76,433 | £ 45,768 |
ASTON MARTIN LAGONDA LIMITED | £2,916,797 | £ 1,247,467 |
COVENTRY UNIVERSITY | ||
UNIPART POWERTRAIN APPLICATIONS LIMITED | £2,843,722 | £ 1,185,832 |
COVENTRY UNIVERSITY | £498,385 | £ 498,385 |
ASPIRE ENGINEERING LIMITED | £261,980 | £ 134,448 |
NCC OPERATIONS LIMITED | £401,130 | £ 401,130 |
UNIVERSITY OF WARWICK | £482,963 | £ 482,963 |
INNOVATE UK | ||
METLASE LIMITED |
People |
ORCID iD |
Krumins James (Project Manager) |