DUNE: Pre-Construction Phase
Lead Research Organisation:
University of Sussex
Department Name: Sch of Mathematical & Physical Sciences
Abstract
Abstracts are not currently available in GtR for all funded research. This is normally because the abstract was not required at the time of proposal submission, but may be because it included sensitive information such as personal details.
Planned Impact
The Impact Statement is centrally submitted through the main submission.
Publications
Adams D
(2018)
Photon detector system timing performance in the DUNE 35-ton prototype liquid argon time projection chamber
in Journal of Instrumentation
Abi B
(2020)
Volume IV. The DUNE far detector single-phase technology
in Journal of Instrumentation
Abi B
(2020)
Long-baseline neutrino oscillation physics potential of the DUNE experiment DUNE Collaboration
in The European Physical Journal C
Abi B
(2020)
Volume I. Introduction to DUNE
in Journal of Instrumentation
Abi B
(2020)
First results on ProtoDUNE-SP liquid argon time projection chamber performance from a beam test at the CERN Neutrino Platform
in Journal of Instrumentation
Adams D
(2020)
Design and performance of a 35-ton liquid argon time projection chamber as a prototype for future very large detectors
in Journal of Instrumentation
Abi B
(2020)
Volume III. DUNE far detector technical coordination
in Journal of Instrumentation
Abi B
(2020)
Neutrino interaction classification with a convolutional neural network in the DUNE far detector
in Physical Review D
Description | This grant was for R&D on the DUNE detectors. Software was developed that will be used in the experiment to do physics in the future when the detector is built. Concepts for triggering the future detector on bursts of neutrinos from galactic supernova were further developed. |
Exploitation Route | We are now building the detectors for DUNE. |
Sectors | Digital/Communication/Information Technologies (including Software) |
Description | DUNE UK Production Project |
Amount | £875,022 (GBP) |
Funding ID | ST/S003568/1 |
Organisation | Science and Technologies Facilities Council (STFC) |
Sector | Public |
Country | United Kingdom |
Start | 09/2019 |
End | 09/2024 |
Description | DUNE collaboration |
Organisation | Fermilab - Fermi National Accelerator Laboratory |
Department | DUNE |
Country | United States |
Sector | Public |
PI Contribution | R&D towards the DUNE experiment. |
Collaborator Contribution | R&D towards the DUNE experiment. |
Impact | Progress towards realising the DUNE experiment. The US DOE has approved construction of the Far detector facility. |
Start Year | 2015 |