DUNE UK Production Project
Lead Research Organisation:
University of Manchester
Department Name: Physics and Astronomy
Abstract
Abstracts are not currently available in GtR for all funded research. This is normally because the abstract was not required at the time of proposal submission, but may be because it included sensitive information such as personal details.
Planned Impact
Please refer to lead JeS form.
Publications
Manly S
(2021)
Deep Underground Neutrino Experiment (DUNE) Near Detector Conceptual Design Report
in Instruments
Garcia-Gamez D
(2019)
A novel electrical method to measure wire tensions for time projection chambers
in Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment
Abud A
(2022)
Low exposure long-baseline neutrino oscillation sensitivity of the DUNE experiment
in Physical Review D
Abud A
(2022)
Scintillation light detection in the 6-m drift-length ProtoDUNE Dual Phase liquid argon TPC
in The European Physical Journal C
Abi B
(2021)
Supernova neutrino burst detection with the Deep Underground Neutrino Experiment DUNE Collaboration
in The European Physical Journal C
Abi B
(2020)
Volume IV. The DUNE far detector single-phase technology
in Journal of Instrumentation
Abi B
(2021)
Prospects for beyond the Standard Model physics searches at the Deep Underground Neutrino Experiment DUNE Collaboration
in The European Physical Journal C
Abi B
(2020)
Volume III. DUNE far detector technical coordination
in Journal of Instrumentation
Abi B
(2020)
Volume I. Introduction to DUNE
in Journal of Instrumentation
Abi B
(2020)
Long-baseline neutrino oscillation physics potential of the DUNE experiment DUNE Collaboration
in The European Physical Journal C
Description | DUNE |
Organisation | European Organization for Nuclear Research (CERN) |
Country | Switzerland |
Sector | Academic/University |
PI Contribution | This grant has enabled us to build two APAs for the protoDUNE test-beam detector that will form the basis for the full DUNE Technical Design Report. |
Collaborator Contribution | The rest of the collaboration are working with us to develop the full DUNE detector. |
Impact | The protoDUNE technical design report. The construction of the protoDUNE detector at CERN. |
Start Year | 2015 |
Description | DUNE |
Organisation | Fermilab - Fermi National Accelerator Laboratory |
Country | United States |
Sector | Public |
PI Contribution | This grant has enabled us to build two APAs for the protoDUNE test-beam detector that will form the basis for the full DUNE Technical Design Report. |
Collaborator Contribution | The rest of the collaboration are working with us to develop the full DUNE detector. |
Impact | The protoDUNE technical design report. The construction of the protoDUNE detector at CERN. |
Start Year | 2015 |
Description | DUNE |
Organisation | University of Wisconsin-Madison |
Country | United States |
Sector | Academic/University |
PI Contribution | This grant has enabled us to build two APAs for the protoDUNE test-beam detector that will form the basis for the full DUNE Technical Design Report. |
Collaborator Contribution | The rest of the collaboration are working with us to develop the full DUNE detector. |
Impact | The protoDUNE technical design report. The construction of the protoDUNE detector at CERN. |
Start Year | 2015 |