Hyper Kamiokande Preconstruction III

Lead Research Organisation: University of Liverpool
Department Name: Physics

Abstract

Abstracts are not currently available in GtR for all funded research. This is normally because the abstract was not required at the time of proposal submission, but may be because it included sensitive information such as personal details.

Publications

10 25 50
 
Description Hyper-Kamiokande is a next generation neutrino experiment that is currently under construction. With this grant we finalised the development of the ligh injection optical calibration system which is now under construction to be installed in the detector as it is built.
Exploitation Route Any detector that uses light injection for optical calibration and calibration of multiple sensors could use these results. We have developed collaborations to share results with the LZ collaboration and aim to continue these in next generation dark matter detectors.
Sectors Other

URL https://www-sk.icrr.u-tokyo.ac.jp/en/hk/
 
Description Hyper-Kamiokande Construction
Amount £800,000 (GBP)
Funding ID ST/V006169/1 
Organisation Science and Technologies Facilities Council (STFC) 
Sector Public
Country United Kingdom
Start 09/2021 
End 09/2022